Operating duty
Standby, prime or continuous requirements.
Project requirements
Multi-unit power plants, grid-parallel controls and lifecycle service for utility-scale duties.
Standby, prime or continuous requirements.
Environment, logistics and installation constraints.
Available fuel quality and supporting systems.
Commissioning, service and parts planning.
Standby, prime or continuous requirements.
Environment, logistics and installation constraints.
Available fuel quality and supporting systems.
Commissioning, service and parts planning.
Standby, prime or continuous requirements.
Environment, logistics and installation constraints.
Available fuel quality and supporting systems.
Commissioning, service and parts planning.
One coordinated generation package.
Power range: 6000 kW Frequency: 50 Hz Rated mode: Prime / continuous Explore Configuration
Parallel units for capacity and operating flexibility.
Power range: Project configured Frequency: 50 Hz Rated mode: On request Explore Configuration
Generation, controls and auxiliaries as one project scope.
Functions: Synchronization, grid connection and unloading Power control: Settable output and load shedding Operation: Manual and automatic Explore Configuration| Design Priority | Recommended Architecture | Core Equipment | Control Strategy | Explore |
|---|---|---|---|---|
| Operating duty | Single package | CG6000 Gas Generator | Project specific | View Solution |
| Site conditions | Multi-unit plant | HRM1000 Heat Recovery Module | Verified before configuration | View Solution |
| Fuel and utilities | Integrated system | Automatic Grid-Parallel Cabinet | Included in selection | View Solution |
| Lifecycle | Single package | Generator Set Parallel Cabinet | Available by project scope | View Solution |
High-output gas generator platform for utility and independent power projects.
Power range: 6000 kW Frequency: 50 Hz View System
A project-defined heat-recovery module that connects suitable generator heat sources to hot-water or process-heat loads after thermal and hydraulic review.
Power range: Project configured Frequency: 50 Hz View System
A brochure-backed grid-parallel cabinet for synchronization, settable power, unloading, load shedding and project-approved grid protection.
Functions: Synchronization, grid connection and unloading Power control: Settable output and load shedding View System
A brochure-backed multi-generator paralleling cabinet for synchronization, load sharing, staged capacity, resilience and future system expansion.
System: Multi-generator common-bus control Functions: Synchronization and active/reactive load sharing View SystemStandby, prime or continuous requirements.
Environment, logistics and installation constraints.
Available fuel quality and supporting systems.
Commissioning, service and parts planning.
Integrated gas generator systems for natural gas, biogas, landfill gas and coalbed methane applications.
Integrated electricity, heat and cooling systems for high-utilization energy projects.
Confirm loads, duty, environment and fuel.
Select equipment and define system interfaces.
Manufacture, test and coordinate installation.
Commission, train and support operations.
Directus projects record
Engineered power equipment and support scope for a complex energy project.
View Project
A 12 MW project combining generator packages, controls and site commissioning.
View Project
A gas, cooling, heating and power tri-generation energy-center project; phase I uses three Jenbacher JMS 612 GS-N.L units.
View ProjectStandby, prime or continuous requirements.
Environment, logistics and installation constraints.
Available fuel quality and supporting systems.
Commissioning, service and parts planning.
Integrated gas generator systems for natural gas, biogas, landfill gas and coalbed methane applications.
Integrated electricity, heat and cooling systems for high-utilization energy projects.
A practical sequence for defining fuel, electrical duty, site, balance-of-plant, heat use and lifecycle responsibilities before a gas-power proposal.
Planning GuideA practical record structure for hours, starts, load, readings, alarms, inspections, service work and corrective actions.
Service GuideA practical guide to automatic transfer, grid-parallel and multi-generator switchgear requirements, sequences and test evidence.
Planning GuideHow operating hours, calendar time, environment, fuel quality, starts and condition evidence shape a practical generator maintenance plan.
Service GuideMulti-unit power plants, grid-parallel controls and lifecycle service for utility-scale duties.