A warranty request begins a documented review. It does not itself approve coverage. Safety containment comes first, followed by preservation of equipment identity, controller records, operating evidence and the applicable contract basis.

Inputs to prepare

  • Sales order, project reference, accepted technical scope and applicable warranty clause
  • Generator, engine, alternator and controller model and serial numbers
  • Commissioning or handover date, operating hours, starts, load and duty
  • Event time, alarm and event export, settings backup, photos, samples and immediate action
  • Maintenance history, fuel or gas condition, environment and recent corrective work

Decisions to confirm

  • Whether the equipment can remain in service, operate with restriction or stay isolated
  • Remote review, site inspection, testing, repair, replacement or return-material path
  • Evidence required before dismantling or returning a component
  • Responsibility, timing and authorization for restart or further testing
  • Case closure evidence and any required monitoring after return to service

Review before release

  • Confirm the contract-specific period and covered equipment
  • Reconcile the reported identity with the delivered configuration
  • Preserve the original alarm/event sequence and record every subsequent change
  • Keep removed parts identified and protected until disposition is agreed
  • Retain the case reference, decision, actions and return-to-service basis